Topsoil Settling Allowance & Blend Density Reference
Screened soil leaves the loader fluffy because trommels trap air. Once raked, rolled, and watered in, loose dirt drops 10% to 15% within 30–60 days. Ordering solely by net geometry leaves turf below walks and creates puddles. Adding a topsoil settling allowance in this topsoil coverage calculator keeps grades level after rain.
| Soil Blend | Typical Mix | Dry–Moist Weight | Settling | Best Use |
|---|---|---|---|---|
| Screened Loam Topsoil | Sand, silt & clay | 2,200 lb/yd³ (1.10 T) | 12% | Lawns, sod, grading (4"–6") |
| Garden Soil 60/40 Blend | 60% loam, 40% compost | 1,900 lb/yd³ (0.95 T) | 15% | Raised beds (10"–18") |
| Sandy Loam Topsoil | 65% sand, 25% silt | 2,400 lb/yd³ (1.20 T) | 10% | Clay fix & drainage beds |
| Lawn Topdressing Mix | 70% sand, 30% compost | 2,100 lb/yd³ (1.05 T) | 8% | Aeration leveling (0.25"–0.5") |
Topsoil Yardage Calculator Formula & Raised Bed Math
In this raised garden bed soil calculator, measure inside framing. Standard 2x lumber is 1.5" thick, so an exterior 4×8 bed measures 3' 9" × 7' 9" inside (29.06 sq ft). At 10" deep, one bed takes 24.2 cu ft (0.90 yd³) net.
Measure rectangular lawns (length × width), circular beds by diameter, or interior walls and count for raised planters.
Use 4–6 inches for new sod or seed, 10–18 inches for raised beds, 8–12 inches for shrubs, or 0.25–0.5 inches for topdressing.
Multiply area (sq ft) by depth (in) and divide by 324 for net cubic yards, then add 8%–15% topsoil settling allowance.
Multiply yards by blend density (1,900–2,400 lb/yd³) for tons, or convert to 27 (1 cu ft) or 36 (0.75 cu ft) bags per yard.
Bulk Topsoil vs. Bags & Dump Truck Limits
Comparing bulk topsoil vs bags turns on bag size and delivery fees. One yard equals 27 1 cu ft bags or 36 0.75 cu ft bags; dense mineral 40-lb bags hold 0.50 cu ft (54 bags/yd³). With $75–$150 drop fees, bagged soil often wins up to 2 yd³, while bulk wins at 3–4+ yd³.
A tri-axle dump truck runs under 60,000–70,000+ lb GVW bridge rules and hauls about 18–20 tons net payload (12–15 yd³). For tight drives, book a single-axle dump truck (4–6 yd³) and lay 3/4" plywood over thin concrete.
Recommended Soil Depth for Lawns, Raised Beds & Topdressing
Till the first 2" into scarified subsoil so water drains across the seam instead of puddling.
Root crops need 12"+ of loose garden soil 60/40 blend, leaving 1.5" below the rim for mulch.
Gives ornamentals loose rooting volume above compacted lot fill; cap with 2"–3" bark mulch.
Broadcast after core aeration and drag into holes without burying grass crowns.
Landscape Ordering, Drainage & Excavation Notice
- Call 811 Before Digging: Request utility locates 48–72 hours before tilling or sod-cutting to mark shallow gas, fiber, electric, and water lines; hand-pot near private irrigation and lighting wires.
- IRC R401.3 Positive Drainage Slope: Slope finished soil at least 6" over the first 10' (5%) away from foundations, and keep grade 4"–6" below siding and weep holes.
- Bulk Moisture Weight & Scale Tickets: Wet weather shifts soil from ~2,000 lb/yd³ dry to 2,400–2,700+ lb/yd³; confirm volumetric yard vs. scale-ticket ton billing.
- Supplier Soil Test (ASTM D5268): Request ASTM D5268 specs (pH, OM%, salts), screen size, and herbicide-free compost verification before delivery.